Galbraith Family Law – Office Renovation

Newmarket, ON

Yorkton Contracting’s scope of work included demolition, new flooring, framing and drywall, installation of new rooftop HVAC unit in conjunction with existing system, installation of sprinklers, interior doors, millwork and new pot lights throughout.

Visual Elements – Equipment Foundation

Woodbridge, ON

Yorkton Contracting’s scope of work included replacing the existing slab on grade to accommodate a new precision laser machine and all civil work for an electrical upgrade including duct bank construction and transformer footing. The scope of work was completed ahead of schedule with no impact on production.

Church Steeple Restoration – Collier St. United Church

Barrie, ON

Collier Street United Church is an active and vibrant church located in the city of Barrie. Yorkton completed exterior restoration of the bell tower and 165 foot high steeple (re-shingling, shutter painting and replacement, tuck pointing and parging). The church remained fully operation during the duration of the project.

City of Barrie – Sanitary Lateral Repairs and Replacement

Barrie, Ontario

Since 2013, Yorkton Contracting has been a preferred contractor to the City of Barrie, providing the City with: watermain and sanitary lateral repairs and replacements, excavation, paving, curbs and sidewalks, landscaping, interior and exterior renovations and new construction services.